Whitelee

Whitelee is a wind, solar and storage project tracked on slava.it.com. The archive holds 6 community posts from 4 groups, latest 2026-10-15. 13 register records are listed (8 REPD, 5 NESO TEC). Their statuses differ, so no single status is given. Top recurring themes: Onshore Wind (5). Posts are archived public group posts and are not independently verified.

Facts and where they come from

Basis: register = taken from a public register (dates and licences are under Data credits).

Abbreviations: REPD = Renewable Energy Planning Database; TEC = Transmission Entry Capacity register; NESO = National Energy System Operator.

ItemValueBasis
Register records13 listed (8 REPD, 5 NESO TEC). Statuses: Operational (4), Planning Permission Granted (3), Scoping (3), Built (2), Appeal Refused (1)register

Register records

Each row is one register record with its own identifier; records are not combined. Relationships are stated only where a register links the records, and are otherwise labelled as unlinked or unverified. REPD dates are the record's update date and the date of the status event where one is recorded. The NESO files give no status date; the date shown is the MW effective-from date.

RegisterIdentifierName as recordedStatusCapacityDateRelationship
REPD3489WhiteleeOperational322 MWrecord updated 2010-05-20; status event 2007-12-14Exact name match.
REPD7174Whitelee Wind Farm Battery Storage ExtensionOperational50 MWrecord updated 2022-02-21; status event 2021-10-01Battery storage extension; REPD links it to 3489 (storage co-location).
REPD2757Whitelee Windfarm Extension phase 2Operational109 MWrecord updated 2013-04-19; status event 2013-01-15'Whitelee Windfarm Extension phase 2'; no REPD link to 3489.
REPD3981Whitelee Windfarm Extension Phase 1Operational108 MWrecord updated 2013-04-22; status event 2012-10-31'Whitelee Windfarm Extension Phase 1'; no REPD link to 3489.
REPD4232Whitelee Windfarm Extension Phase 3Appeal Refused12 MWrecord updated 2016-11-01; status event 2016-10-19'Whitelee Windfarm Extension Phase 3'; no REPD link to 3489.
REPD8341Whitelees Hydrogen Production Facility, Solar Farm & Battery StoragePlanning Permission Granted40 MWrecord updated 2025-01-20; status event 2025-01-09'Whitelees' hydrogen, solar and battery project; REPD links 8341, 8342 and 9076 to each other, not to 3489.
REPD8342Whitelees Hydrogen Production Facility, Solar Farm & Battery StoragePlanning Permission Granted50 MWrecord updated 2025-01-20; status event 2025-01-09'Whitelees' hydrogen, solar and battery project; linked to 8341 and 9076 only.
REPD9076Whitelees Hydrogen Production Facility, Solar Farm & Battery StoragePlanning Permission Granted20 MWrecord updated 2025-01-20; status event 2025-01-09'Whitelees' hydrogen, solar and battery project; linked to 8341 and 8342 only.
NESO TECPRO-000067-1WhiteleeBuiltconnected 305 MW; cumulative 305 MWno effective date in the fileStage 1 of NESO project PRO-000067; no identifier is shared with the REPD records, so the link to REPD 3489 is unverified.
NESO TECPRO-000067-2WhiteleeScopingconnected 0 MW; cumulative 355 MWMW effective from 2031-05-02Stage 2 of NESO project PRO-000067.
NESO TECPRO-000067-3WhiteleeScopingconnected 0 MW; cumulative 660 MWMW effective from 2033-04-25Stage 3 of NESO project PRO-000067.
NESO TECPRO-000067-4WhiteleeScopingconnected 0 MW; cumulative 818 MWMW effective from 2034-04-27Stage 4 of NESO project PRO-000067.
NESO TECPRO-000068Whitelee ExtensionBuiltconnected 206 MW; cumulative 238 MWMW effective from 2026-12-01'Whitelee Extension'; a different NESO project number; its relation to the REPD extension records is unverified.

The records listed describe the registered assets. Several archived posts discuss a repowering proposal; a search of the registers by name did not establish that proposal's register status, so none is shown here.

Data credits

Source groups

GroupPosts
Scotland Against Spin3
Hurlford Rufus Data Centre Community Group1
Our Power1
Scottish Electricity Generating Stations1

Theme breakdown

ThemePosts
Onshore Wind5

What is the planning status of Whitelee?

No single status applies. Statuses by register record: Operational (4), Planning Permission Granted (3), Scoping (3), Built (2), Appeal Refused (1). The table gives each record's identifier, date and relationship; records are not combined. The records listed describe the registered assets. Several archived posts discuss a repowering proposal; a search of the registers by name did not establish that proposal's register status, so none is shown here.

What are the main community discussions around Whitelee?

6 archived public posts from 4 groups, dated 2026-07-22 to 2026-10-15. The most frequent theme tags are Onshore Wind (5). Post text is not reproduced here; each archive entry links to the post.