Scoop Hill Wind Farm

Scoop Hill Wind Farm is a wind, solar and storage project tracked on slava.it.com. The archive holds 4 community posts from 1 group, latest 2026-05-28. 3 register records are listed (2 REPD, 1 NESO TEC). Their statuses differ, so no single status is given. Top recurring themes: Onshore Wind (3).

Facts and where they come from

Basis: register = taken from a public register (dates and licences are under Data credits).

Abbreviations: REPD = Renewable Energy Planning Database; TEC = Transmission Entry Capacity register; NESO = National Energy System Operator.

ItemValueBasis
Register records3 listed (2 REPD, 1 NESO TEC). Statuses: Planning Permission Refused (2), Awaiting Consents (1)register

Register records

Each row is one register record with its own identifier; records are not combined. Relationships are stated only where a register links the records, and are otherwise labelled as unlinked or unverified. REPD dates are the record's update date and the date of the status event where one is recorded. The NESO files give no status date; the date shown is the MW effective-from date.

RegisterIdentifierName as recordedStatusCapacityDateRelationship
REPD7454Scoop Hill Wind FarmPlanning Permission Refused432 MWrecord updated 2026-06-22; status event 2026-02-05Exact name match.
REPD20966Scoop Hill Wind FarmPlanning Permission Refused200 MWrecord updated date not recorded; status event 2026-02-05Exact name match; REPD links it to 7454 (storage co-location link type).
NESO TECPRO-000327Scoop Hill Wind FarmAwaiting Consentsconnected 0 MW; cumulative 500 MWMW effective from 2027-10-31Exact name match in the NESO file; no identifier is shared with the REPD records.

Data credits

Source groups

GroupPosts
Scotland Against Spin4

Theme breakdown

ThemePosts
Onshore Wind3

What is the planning status of Scoop Hill Wind Farm?

No single status applies. Statuses by register record: Planning Permission Refused (2), Awaiting Consents (1). The table gives each record's identifier, date and relationship; records are not combined.

What are the main community discussions around Scoop Hill Wind Farm?

4 archived public posts from 1 group, dated 2026-02-06 to 2026-05-28. The most frequent theme tags are Onshore Wind (3). Post text is not reproduced here; each archive entry links to the post.

Archive entries

Back to the archive