Sanquhar II Wind Farm
Sanquhar II Wind Farm is a wind, solar and storage project tracked on slava.it.com. The archive holds 6 community posts from 2 groups, latest 2026-10-13. 2 register records are listed (2 NESO TEC). All list the status Consents Approved. Top recurring themes: Onshore Wind (5). Posts are archived public group posts and are not independently verified.
Facts and where they come from
Basis: register = taken from a public register (dates and licences are under Data credits).
Abbreviations: TEC = Transmission Entry Capacity register; NESO = National Energy System Operator.
| Item | Value | Basis |
|---|---|---|
| Register records | 2 listed (2 NESO TEC). Statuses: Consents Approved (2) | register |
Register records
Each row is one register record with its own identifier; records are not combined. Relationships are stated only where a register links the records, and are otherwise labelled as unlinked or unverified. The NESO files give no status date; the date shown is the MW effective-from date.
| Register | Identifier | Name as recorded | Status | Capacity | Date | Relationship |
|---|---|---|---|---|---|---|
| NESO TEC | PRO-000352-1 | Sanquhar II Wind Farm | Consents Approved | connected 0 MW; cumulative 137 MW | MW effective from 2026-07-31 | Stage 1 of NESO project PRO-000352. |
| NESO TEC | PRO-000352-2 | Sanquhar II Wind Farm | Consents Approved | connected 0 MW; cumulative 250 MW | MW effective from 2027-02-28 | Stage 2 of NESO project PRO-000352. |
Data credits
- Supported by National Energy SO Open Data. Data: Transmission Entry Capacity (TEC) register, National Energy System Operator. Licence: NESO Open Data Licence v1.0. Source: https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register. Source dates: Release date: 2026-10-10; Download date: 2026-10-13; Facts exported: 2026-10-18.
- Use of these registers does not imply endorsement by their publishers.
Source groups
| Group | Posts |
|---|---|
| Scotland Against Spin | 5 |
| Scottish Electricity Generating Stations | 1 |
Theme breakdown
| Theme | Posts |
|---|---|
| Onshore Wind | 5 |
What is the planning status of Sanquhar II Wind Farm?
All 2 listed register records show the status Consents Approved.
What are the main community discussions around Sanquhar II Wind Farm?
6 archived public posts from 2 groups, dated 2026-01-21 to 2026-10-13. The most frequent theme tags are Onshore Wind (5). Post text is not reproduced here; each archive entry links to the post.
Archive entries
- 2026-10-13, Scottish Electricity Generating Stations · themes: Onshore Wind
- 2026-04-10, Scotland Against Spin · themes: Onshore Wind
- 2026-04-09, Scotland Against Spin · themes: Onshore Wind
- 2026-03-05, Scotland Against Spin · themes: none tagged
- 2026-02-10, Scotland Against Spin · themes: Onshore Wind
- 2026-01-21, Scotland Against Spin · themes: Onshore Wind