Overhill Wind Farm
Overhill Wind Farm is a pylons and grid project tracked on slava.it.com. The archive holds 2 community posts from 1 group, latest 2026-10-06. No planning reference is recorded in the registers used. TEC project status: Consents Approved (register). Top recurring themes: Onshore Wind (2), Substation (1). Posts are archived public group posts and are not independently verified.
Facts and where they come from
Basis: register = taken from a public register (dates and licences are under Data credits).
Abbreviations: TEC = Transmission Entry Capacity register.
| Item | Value | Basis |
|---|---|---|
| TEC project status | Consents Approved | register |
Data credits
- Supported by National Energy SO Open Data. Data: Transmission Entry Capacity (TEC) register, National Energy System Operator. Licence: NESO Open Data Licence v1.0. Source: https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register. Source dates: Release date: 2026-10-10; Download date: 2026-10-13; Facts exported: 2026-10-18.
- Use of these registers does not imply endorsement by their publishers.
Source groups
| Group | Posts |
|---|---|
| Scotland Against Spin | 2 |
Theme breakdown
| Theme | Posts |
|---|---|
| Onshore Wind | 2 |
| Substation | 1 |
What is the planning status of Overhill Wind Farm?
Recorded: TEC project status: Consents Approved (register).
What are the main community discussions around Overhill Wind Farm?
2 archived public posts from 1 group, dated 2026-09-25 to 2026-10-06. The most frequent theme tags are Onshore Wind (2), Substation (1). Post text is not reproduced here; each archive entry links to the post.
Archive entries
- 2026-10-06, Scotland Against Spin · themes: Onshore Wind, Substation
- 2026-09-25, Scotland Against Spin · themes: Onshore Wind