Norwich to Tilbury (East Anglia GREEN)
Norwich to Tilbury (East Anglia GREEN) is a wind, solar and storage project tracked on slava.it.com. The archive holds 2 community posts from 1 group, latest 2026-10-13. No planning reference is recorded in the registers used. Consent or stage: DCO application EN020027, accepted for examination 26 September 2025 (reported). Top recurring themes: none tagged.
Facts and where they come from
Basis: reported = stated in a report linked under Sources for reported facts; we have not checked it.
| Item | Value | Basis |
|---|---|---|
| Consent or stage | DCO application EN020027, accepted for examination 26 September 2025 | reported |
| Operator | National Grid Electricity Transmission | reported |
| Kind | grid corridor (planned) | reported |
Sources for reported facts
Source groups
| Group | Posts |
|---|---|
| Essex Suffolk Norfolk Pylons | 2 |
Theme breakdown
| Theme | Posts |
|---|
What is the planning status of Norwich to Tilbury (East Anglia GREEN)?
Recorded: Consent or stage: DCO application EN020027, accepted for examination 26 September 2025 (reported).
What are the main community discussions around Norwich to Tilbury (East Anglia GREEN)?
2 archived public posts from 1 group, dated 2026-10-07 to 2026-10-13. The most frequent theme tags are none tagged. Post text is not reproduced here; each archive entry links to the post.
Archive entries
- 2026-10-13, Essex Suffolk Norfolk Pylons · themes: none tagged
- 2026-10-07, Essex Suffolk Norfolk Pylons · themes: none tagged