Newlands Hill Wind Energy Hub
Newlands Hill Wind Energy Hub is a wind, solar and storage project tracked on slava.it.com. The archive holds 5 community posts from 1 group, latest 2026-10-13. 3 register records are listed (2 REPD, 1 NESO TEC). Their statuses differ, so no single status is given. Top recurring themes: BESS (1), Hybrid (1).
Facts and where they come from
Basis: register = taken from a public register (dates and licences are under Data credits).
Abbreviations: REPD = Renewable Energy Planning Database; TEC = Transmission Entry Capacity register; NESO = National Energy System Operator.
| Item | Value | Basis |
|---|---|---|
| Register records | 3 listed (2 REPD, 1 NESO TEC). Statuses: Planning Application Submitted (2), Awaiting Consents (1) | register |
Register records
Each row is one register record with its own identifier; records are not combined. Relationships are stated only where a register links the records, and are otherwise labelled as unlinked or unverified. REPD dates are the record's update date and the date of the status event where one is recorded. The NESO files give no status date; the date shown is the MW effective-from date.
| Register | Identifier | Name as recorded | Status | Capacity | Date | Relationship |
|---|---|---|---|---|---|---|
| REPD | 12289 | Newlands Hill Wind Energy Hub | Planning Application Submitted | 136 MW | record updated 2023-12-07; status event 2023-11-14 | Exact name match. |
| REPD | 15383 | Newlands Hill Wind Energy Hub | Planning Application Submitted | 136 MW | record updated 2023-12-07; status event 2023-11-14 | Exact name match; REPD links it to 12289 (storage co-location). |
| NESO TEC | PRO-002549 | Newlands Hill Wind Energy Hub | Awaiting Consents | connected 0 MW; cumulative 119 MW | MW effective from 2030-04-03 | Exact name match in the NESO file; no identifier is shared with the REPD records. |
Data credits
- Contains public sector information licensed under the Open Government Licence v3.0. Data: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero (© Crown copyright). Licence: Open Government Licence v3.0. Source: https://www.gov.uk/government/publications/renewable-energy-planning-database-monthly-extract. Source dates: Edition: Q2 2026; Release date: 2026-08-03; Latest record update in the file: 2026-07-24; Download date: 2026-08-25; Facts exported: 2026-10-18.
- Supported by National Energy SO Open Data. Data: Transmission Entry Capacity (TEC) register, National Energy System Operator. Licence: NESO Open Data Licence v1.0. Source: https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register. Source dates: Release date: 2026-10-10; Download date: 2026-10-13; Facts exported: 2026-10-18.
- Use of these registers does not imply endorsement by their publishers.
Source groups
| Group | Posts |
|---|---|
| Scotland Against Spin | 5 |
Theme breakdown
| Theme | Posts |
|---|---|
| BESS | 1 |
| Hybrid | 1 |
| Onshore Wind | 1 |
What is the planning status of Newlands Hill Wind Energy Hub?
No single status applies. Statuses by register record: Planning Application Submitted (2), Awaiting Consents (1). The table gives each record's identifier, date and relationship; records are not combined.
What are the main community discussions around Newlands Hill Wind Energy Hub?
5 archived public posts from 1 group, dated 2026-02-27 to 2026-10-13. The most frequent theme tags are BESS (1), Hybrid (1), Onshore Wind (1). Post text is not reproduced here; each archive entry links to the post.
Archive entries
- 2026-10-13, Scotland Against Spin · themes: BESS, Hybrid, Onshore Wind
- 2026-07-10, Scotland Against Spin · themes: none tagged
- 2026-03-07, Scotland Against Spin · themes: none tagged
- 2026-03-06, Scotland Against Spin · themes: none tagged
- 2026-02-27, Scotland Against Spin · themes: none tagged