Newlands Hill Wind Energy Hub

Newlands Hill Wind Energy Hub is a wind, solar and storage project tracked on slava.it.com. The archive holds 5 community posts from 1 group, latest 2026-10-13. 3 register records are listed (2 REPD, 1 NESO TEC). Their statuses differ, so no single status is given. Top recurring themes: BESS (1), Hybrid (1).

Facts and where they come from

Basis: register = taken from a public register (dates and licences are under Data credits).

Abbreviations: REPD = Renewable Energy Planning Database; TEC = Transmission Entry Capacity register; NESO = National Energy System Operator.

ItemValueBasis
Register records3 listed (2 REPD, 1 NESO TEC). Statuses: Planning Application Submitted (2), Awaiting Consents (1)register

Register records

Each row is one register record with its own identifier; records are not combined. Relationships are stated only where a register links the records, and are otherwise labelled as unlinked or unverified. REPD dates are the record's update date and the date of the status event where one is recorded. The NESO files give no status date; the date shown is the MW effective-from date.

RegisterIdentifierName as recordedStatusCapacityDateRelationship
REPD12289Newlands Hill Wind Energy HubPlanning Application Submitted136 MWrecord updated 2023-12-07; status event 2023-11-14Exact name match.
REPD15383Newlands Hill Wind Energy HubPlanning Application Submitted136 MWrecord updated 2023-12-07; status event 2023-11-14Exact name match; REPD links it to 12289 (storage co-location).
NESO TECPRO-002549Newlands Hill Wind Energy HubAwaiting Consentsconnected 0 MW; cumulative 119 MWMW effective from 2030-04-03Exact name match in the NESO file; no identifier is shared with the REPD records.

Data credits

Source groups

GroupPosts
Scotland Against Spin5

Theme breakdown

ThemePosts
BESS1
Hybrid1
Onshore Wind1

What is the planning status of Newlands Hill Wind Energy Hub?

No single status applies. Statuses by register record: Planning Application Submitted (2), Awaiting Consents (1). The table gives each record's identifier, date and relationship; records are not combined.

What are the main community discussions around Newlands Hill Wind Energy Hub?

5 archived public posts from 1 group, dated 2026-02-27 to 2026-10-13. The most frequent theme tags are BESS (1), Hybrid (1), Onshore Wind (1). Post text is not reproduced here; each archive entry links to the post.