Kintore to Tealing 400kV overhead line
Kintore to Tealing 400kV overhead line is a wind, solar and storage project tracked on slava.it.com. The archive holds 5 community posts from 1 group, latest 2026-09-19. No planning reference is recorded in the registers used. Consent or stage: Section 37 application submitted (Scottish Ministers); determination expected within 12 months (reported). Top recurring themes: OHL (Pylons) (1).
Facts and where they come from
Basis: reported = stated in a report linked under Sources for reported facts; we have not checked it.
| Item | Value | Basis |
|---|---|---|
| Consent or stage | Section 37 application submitted (Scottish Ministers); determination expected within 12 months | reported |
| Operator | SSEN Transmission | reported |
| Kind | grid corridor (planned) | reported |
Sources for reported facts
Source groups
| Group | Posts |
|---|---|
| Scotland Against Spin | 5 |
Theme breakdown
| Theme | Posts |
|---|---|
| OHL (Pylons) | 1 |
What is the planning status of Kintore to Tealing 400kV overhead line?
Recorded: Consent or stage: Section 37 application submitted (Scottish Ministers); determination expected within 12 months (reported).
What are the main community discussions around Kintore to Tealing 400kV overhead line?
5 archived public posts from 1 group, dated 2026-03-15 to 2026-09-19. The most frequent theme tags are OHL (Pylons) (1). Post text is not reproduced here; each archive entry links to the post.
Archive entries
- 2026-09-19, Scotland Against Spin · themes: OHL (Pylons)
- 2026-06-16, Scotland Against Spin · themes: none tagged
- 2026-06-09, Scotland Against Spin · themes: none tagged
- 2026-03-20, Scotland Against Spin · themes: none tagged
- 2026-03-15, Scotland Against Spin · themes: none tagged