Golticlay Wind Farm

Golticlay Wind Farm is a wind, solar and storage project tracked on slava.it.com. The archive holds 4 community posts from 2 groups, latest 2026-10-02. 7 register records are listed (4 REPD, 3 NESO Embedded). Their statuses differ, so no single status is given. Top recurring themes: Onshore Wind (3). Posts are archived public group posts and are not independently verified.

Facts and where they come from

Basis: register = taken from a public register (dates and licences are under Data credits).

Abbreviations: REPD = Renewable Energy Planning Database; NESO = National Energy System Operator.

ItemValueBasis
Register records7 listed (4 REPD, 3 NESO Embedded). Statuses: Planning Application Submitted (2), Awaiting Consents (2), Under Construction (1), No Application Required (1), Scoping (1)register

Register records

Each row is one register record with its own identifier; records are not combined. Relationships are stated only where a register links the records, and are otherwise labelled as unlinked or unverified. REPD dates are the record's update date and the date of the status event where one is recorded. The NESO files give no status date; the date shown is the MW effective-from date.

RegisterIdentifierName as recordedStatusCapacityDateRelationship
REPD5195Golticlay Wind FarmUnder Construction72.6 MWrecord updated 2026-02-23; status event 2025-07-01Exact name match.
REPD20387Golticlay Wind Farm 2No Application Required13.2 MWrecord updated 2026-02-23'Golticlay Wind Farm 2'; the REPD file gives it the same map reference as 5195; no identifier link.
REPD18325Golticlay Wind Farm, Bulreanrob - Wind FarmPlanning Application Submittednot recordedrecord updated 2026-01-09; status event 2025-12-03Bulreanrob wind farm record; REPD links 18325 and 18326 to each other, not to 5195.
REPD18326Golticlay Wind Farm, Bulreanrob - Battery Energy StoragePlanning Application Submittednot recordedrecord updated 2026-01-09; status event 2025-12-03Bulreanrob battery storage; REPD links it to 18325 (storage co-location).
NESO EmbeddedPRO-000370-1Golticlay Wind FarmAwaiting Consentsconnected 0 MW; cumulative 50.07 MWMW effective from 2026-07-31Stage 1 of NESO project PRO-000370 (Embedded Register); same name as REPD 5195 but capacity differs and no identifier is shared, so the link is unverified.
NESO EmbeddedPRO-000370-2Golticlay Wind FarmScopingconnected 0 MW; cumulative 58 MWMW effective from 2026-07-31Stage 2 of NESO project PRO-000370.
NESO EmbeddedPRO-000926Golticlay Extension Wind FarmAwaiting Consentsconnected 0 MW; cumulative 55 MWMW effective from 2027-09-30'Golticlay Extension Wind Farm'; a different NESO project number; relation to the REPD records is unverified.

Data credits

Source groups

GroupPosts
Scotland Against Spin3
Scottish Electricity Generating Stations1

Theme breakdown

ThemePosts
Onshore Wind3

What is the planning status of Golticlay Wind Farm?

No single status applies. Statuses by register record: Planning Application Submitted (2), Awaiting Consents (2), Under Construction (1), No Application Required (1), Scoping (1). The table gives each record's identifier, date and relationship; records are not combined.

What are the main community discussions around Golticlay Wind Farm?

4 archived public posts from 2 groups, dated 2026-02-22 to 2026-10-02. The most frequent theme tags are Onshore Wind (3). Post text is not reproduced here; each archive entry links to the post.