Beauly to Peterhead 400kV overhead line
Beauly to Peterhead 400kV overhead line is a pylons and grid project tracked on slava.it.com. The archive holds 4 community posts from 2 groups, latest 2026-10-14. No planning reference is recorded in the registers used. Consent or stage: Section 37 application, ECU00005165, submitted October 2025 (reported). Top recurring themes: OHL (Pylons) (3), Substation (1).
Facts and where they come from
Basis: reported = stated in a report linked under Sources for reported facts; we have not checked it.
| Item | Value | Basis |
|---|---|---|
| Consent or stage | Section 37 application, ECU00005165, submitted October 2025 | reported |
| Operator | SSEN Transmission | reported |
| Kind | grid corridor (planned) | reported |
Sources for reported facts
Source groups
| Group | Posts |
|---|---|
| Wind Energy's Absurd | 3 |
| Scotland Against Spin | 1 |
Theme breakdown
| Theme | Posts |
|---|---|
| OHL (Pylons) | 3 |
| Substation | 1 |
What is the planning status of Beauly to Peterhead 400kV overhead line?
Recorded: Consent or stage: Section 37 application, ECU00005165, submitted October 2025 (reported).
What are the main community discussions around Beauly to Peterhead 400kV overhead line?
4 archived public posts from 2 groups, dated 2026-08-14 to 2026-10-14. The most frequent theme tags are OHL (Pylons) (3), Substation (1). Post text is not reproduced here; each archive entry links to the post.
Archive entries
- 2026-10-14, Wind Energy's Absurd · themes: OHL (Pylons), Substation
- 2026-10-12, Wind Energy's Absurd · themes: OHL (Pylons)
- 2026-09-23, Wind Energy's Absurd · themes: none tagged
- 2026-08-14, Scotland Against Spin · themes: OHL (Pylons)