Beauly to Peterhead 400kV overhead line

Beauly to Peterhead 400kV overhead line is a pylons and grid project tracked on slava.it.com. The archive holds 4 community posts from 2 groups, latest 2026-10-14. No planning reference is recorded in the registers used. Consent or stage: Section 37 application, ECU00005165, submitted October 2025 (reported). Top recurring themes: OHL (Pylons) (3), Substation (1).

Facts and where they come from

Basis: reported = stated in a report linked under Sources for reported facts; we have not checked it.

ItemValueBasis
Consent or stageSection 37 application, ECU00005165, submitted October 2025reported
OperatorSSEN Transmissionreported
Kindgrid corridor (planned)reported

Sources for reported facts

Source groups

GroupPosts
Wind Energy's Absurd3
Scotland Against Spin1

Theme breakdown

ThemePosts
OHL (Pylons)3
Substation1

What is the planning status of Beauly to Peterhead 400kV overhead line?

Recorded: Consent or stage: Section 37 application, ECU00005165, submitted October 2025 (reported).

What are the main community discussions around Beauly to Peterhead 400kV overhead line?

4 archived public posts from 2 groups, dated 2026-08-14 to 2026-10-14. The most frequent theme tags are OHL (Pylons) (3), Substation (1). Post text is not reproduced here; each archive entry links to the post.

Archive entries

Back to the archive