Arecleoch Wind Farm and extension

Arecleoch Wind Farm and extension is a wind, solar and storage project tracked on slava.it.com. The archive holds 2 community posts from 2 groups, latest 2026-10-02. 6 register records are listed (3 REPD, 3 NESO TEC). Their statuses differ, so no single status is given. Top recurring themes: Onshore Wind (1).

Facts and where they come from

Basis: register = taken from a public register (dates and licences are under Data credits).

Abbreviations: REPD = Renewable Energy Planning Database; TEC = Transmission Entry Capacity register; NESO = National Energy System Operator.

ItemValueBasis
Register records6 listed (3 REPD, 3 NESO TEC). Statuses: Scoping (2), Under Construction (2), Operational (1), Built (1)register

Register records

Each row is one register record with its own identifier; records are not combined. Relationships are stated only where a register links the records, and are otherwise labelled as unlinked or unverified. REPD dates are the record's update date and the date of the status event where one is recorded. The NESO files give no status date; the date shown is the MW effective-from date.

RegisterIdentifierName as recordedStatusCapacityDateRelationship
REPD3258Arecleoch WindfarmOperational120 MWrecord updated 2011-10-25; status event 2011-06-14Original wind farm; the name is spelled 'Arecleoch Windfarm'; no identifier is shared with the REPD NESO rows.
NESO TECPRO-000012-1ArecleochBuiltconnected 114 MW; cumulative 114 MWno effective date in the fileStage 1 of NESO project PRO-000012; relation to REPD 3258 is unverified (same site name, no shared identifier).
NESO TECPRO-000012-2ArecleochScopingconnected 0 MW; cumulative 330 MWMW effective from 2032-06-15Stage 2 of NESO project PRO-000012.
REPD6798Arecleoch Wind Farm (extension)Under Construction72.8 MWrecord updated 2025-07-25; status event 2025-06-01Extension: the REPD name is 'Arecleoch Wind Farm (extension)'.
REPD7882Arecleoch Wind Farm (extension)Under Construction20 MWrecord updated 2025-07-25; status event 2025-06-01Extension battery storage; REPD links it to 6798 (storage co-location).
NESO TECPRO-001111Arecleoch Extension WindfarmScopingconnected 0 MW; cumulative 72.8 MWMW effective from 2026-08-31'Arecleoch Extension Windfarm'; same capacity (72.8 MW) as REPD 6798 but no shared identifier, so the relation is unverified.

Data credits

Source groups

GroupPosts
Scottish Electricity Generating Stations1
Scotland Against Spin1

Theme breakdown

ThemePosts
Onshore Wind1

What is the planning status of Arecleoch Wind Farm and extension?

No single status applies. Statuses by register record: Scoping (2), Under Construction (2), Operational (1), Built (1). The table gives each record's identifier, date and relationship; records are not combined.

What are the main community discussions around Arecleoch Wind Farm and extension?

2 archived public posts from 2 groups, dated 2026-10-01 to 2026-10-02. The most frequent theme tags are Onshore Wind (1). Post text is not reproduced here; each archive entry links to the post.